USEPA Cracks Down on Stormwater Violations - Levies Multi-Million Dollar Penalties.

In June 2008, the United States Environmental Protection Agency announced a $4.3 million dollar settlement against four national residential real estate development companies. The government alleged that those companies violated the federal Clean Water Act (“CWA”) requirements addressing the discharge of stormwater (i.e., rainwater/snow melt runoff) from construction sites. Under the CWA, a permit and a stormwater management plan are required for the discharge of stormwater from a construction site. The EPA alleged that the companies had either not obtained a permit before commencing their construction activities or failed to abide by the terms of permits they had obtained. This enforcement action follows several other recent high profile stormwater permit enforcement actions undertaken over the past several years that resulted in $4.4 million dollars in penalties against two national box retail stores.

The CWA generally requires that a developer obtain a stormwater discharge permit before starting construction activities at a property. It allows states to assume the role of the permitting authority for stormwater permits. Delaware, New Jersey, New York and Maryland have been delegated such permitting authority from the EPA. As such, the state environmental agency within a delegated state issues permits for stormwater discharges under the CWA. EPA retains oversight authority over the state stormwater permitting programs – that is why the recent enforcement actions were brought by the EPA.

In New Jersey, a construction project which will disturb more than one acre of land requires a stormwater discharge permit. The state Department of Environmental Protection (“DEP”) has established a general stormwater discharge permit for construction activities, through which the DEP pre-determined that any construction projects meeting the criteria for the general permit will be covered by the general permit. (There are also general stormwater permits for industrial facilities, concrete manufacturers and other business categories, which permits address stormwater runoff from the operation of covered facilities.) To obtain coverage under the construction general permit, the developer must submit a Request for Authorization to the local Soil Conservation District for their approval. This is unlike an individual discharge permit, which requires a detailed state engineering review.

Obtaining the general stormwater permit for construction activities is, however, only the first step towards compliance with the CWA’s stormwater requirements. Once the permit is in place, the permit holder must comply with the terms of that permit. Failing to abide by the terms of the permit is also a violation of law which exposes the developer significant penalties. The most important component of the general stormwater construction permit is the development and certification of a Stormwater Pollution Prevention Plan 

The SWPPP consists of a soil erosion and sediment control element and a construction site waste control component. The soil erosion and sediment control element is governed by a soil erosion and sediment control plan and includes controls such as silt fences to minimize soil runoff. The construction site waste control element contains requirements which address materials management to prevent or reduce waste and waste handling, which in turn reduces the potential for such waste materials to flow off-site with stormwater. Examples of construction site waste include waste building material and rubble, chemical waste, litter, sanitary sewage, contaminated soils and concrete truck washout.

By obtaining a permit for stormwater discharges at construction sites, and complying with the terms of the SWPPP, a developer will avoid a potentially costly enforcement action by the state or the EPA. The EPA has sent a very strong signal to the regulated community that it takes stormwater discharges and compliance with the CWA very seriously. A developer must ensure that its professional team, including engineers, construction managers and attorneys, are paying close attention to stormwater permitting requirements to avoid such costly mistakes.

Enforcement Power of NJDEP Increased

On January 4, 2008, the New Jersey legislature passed the Environmental Enforcement Enhancement Act. This Act enhances the enforcement authority of the New Jersey Department of Environmental Protection (“DEP”) under ten environmental statutes: Waterfront Development Act, Pesticide Control Act of 1971, Wetlands Act of 1970, Freshwater Protection Act, Coastal Area Facility Review Act, Endangered and Nongame Species Conservation Act, Water Supply Management Act, Safe Dam Act, Safe Drinking Water Act, and the Flood Hazard Area Control Act. The Act also amends the DEP enabling statute by clarifying DEP’s authority to inspect facilities, collect samples and copy documents to determine compliance with environmental laws, regulations, permits, and orders.

The Act strengthens the enforcement provisions of the ten statutes listed above and substantially increases the penalties DEP may seek against violators. The Act greatly broadens the enforcement authority of the DEP by authorizing it to issue an order requiring any person to comply, to bring a civil action, to levy a civil administrative penalty, or to petition the attorney general to bring a criminal action if a violation occurs. The amendments are substantial because many statutes prior to the passage of the Act only contained minimal penalties for violators or did not contain any provisions for assessing administrative penalties. For example, the Waterfront Development Act’s previous maximum penalty was $1,000 with an additional fine of $100 for each day the violation continued. As amended the penalty is increased to $25,000 per violation, per day. 

To help ensure compliance with environmental statutes, the Act significantly increases civil and criminal penalties including the following changes: (1) uniformly increases the maximum civil penalty amount to $25,000 per day; (2) authorizes daily penalty assessments for continuing violations; (3) authorizes the recovery of compensatory damages for loss or destruction of natural resources (e.g.-creates authority for DEP to recover natural resource damages, which are money damages from anyone responsible for spills or discharges of hazardous substances); (4) authorizes the DEP to recover reasonable costs incurred by the State in removing or correcting a violation, and to recover all reasonable costs incurred in bringing a civil action, which could be interpreted to mean recovery of attorneys’ fees; and (4) clarifies and in some statutes creates criminal provisions for purposeful, knowing, and reckless violations or falsifications. In addition, the Act broadens the DEP’s authority to compel a property owner to record a deed notice on its property where an alleged violation has occurred, under acts such as the Dam Safety Act or the Flood Hazard Protection Act. Prior to the Act’s passage the DEP only had this authority for a violation of the Freshwater Wetlands Protection Act. In fact, the Act allows DEP to require the recording of such a notice based only upon an allegation prior to adjudication.

With the passage of this Act, DEP has increased its enforcement authority and permits it to seek higher penalties for violations that may have previously been cost effective to commit and new avenues to seek such penalties. Its passage will likely lead to an increase in enforcement actions brought by the DEP.